Prior to demolition, it’s critical to have all trades prepared to meet their part of the schedule, to ensure areas impacted by construction is returned to the client as soon as possible. This also includes pre ordering of any long lead time items, such as cabinetry, specialty finishes, and plumbing/electrical fixtures.
After demolition, The new layout walls are framed, subfloor prepared to accept floor finish.
Rough plumbing and mechanical installed, followed by rough electrical.
Wet areas are waterproofed, followed by tile backer and drywall installation.
Drywall and tile backer installed, followed by waterproofing wet areas.
Finish materials can now be installed: tile, stone, plaster, paint.
Project is completed with cabinetry, counters, finish plumbing and finish electrical
Ductwork and insulation
We use cookies to improve your experience, analyze traffic, and personalize content. You can manage your cookie preferences or opt out of non-essential cookies at any time.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
These cookies are needed for adding comments on this website.
Google reCAPTCHA helps protect websites from spam and abuse by verifying user interactions through challenges.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Marketing cookies are used to follow visitors to websites. The intention is to show ads that are relevant and engaging to the individual user.
Google Maps is a web mapping service providing satellite imagery, real-time navigation, and location-based information.
Service URL: policies.google.com (opens in a new window)
You can find more information in our Cookie Policy and Privacy Policy.